Partial view of the timber façades of two large residential buildings | © Florian Holzherr

Timber hybrid residential building in Munich

Fast construction for good living

Record-breaking: in 2021/2022, LignoAlp transported the wall elements for 105 flats to Munich-Freiham in 42 transports and assembled them in just 24 weeks. The total area of the exterior walls ist 4,414 m².

Timber hybrid residential building in Munich | © Florian Holzherr
The total area of the exterior walls ist 4,414 m².
Timber hybrid residential building in Munich | © Florian Holzherr
The façade elements, including windows, French doors and cladding were prefabricated

In the west of Munich, a new neighbourhood has been created on an area of 350 hectares, where more than 25,000 people live and almost 15,000 people work. The Progeno housing cooperative has erected four buildings with a total of 105 cooperative flats in timber hybrid construction. Three of these are five-storey and one is four-storey. The ground floors and the load-bearing structure are made of reinforced concrete, while the outer walls of the upper floors consist of prefabricated wall elements with cladding made of pyrite grey impregnated spruce. The façade construction was prefabricated by LignoAlp as a timber frame construction and insulated with rock wool for fire protection reasons.

Timber hybrid residential building in Munich | © Florian Holzherr
Gallery
Timber hybrid residential building in Munich | © Florian Holzherr Timber hybrid residential building in Munich | © Florian Holzherr Timber hybrid residential building in Munich | © Florian Holzherr
About the project

Data & Facts


Please contact us

Would you like to know more?


This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Similar Projects

Learn more about the topic
Wood hybrid construction