Uninterrupted: The production halls of the Forst special beer brewery in Algund were built in the 1970s. Almost 40 years later, the 2,200 m² roof required extensive renovation.
In the course of the renovation, production operations were not to be interrupted at any time. In addition to the static challenge of the over 36m cantilever structure, the continuity of the underlying production process posed the greatest challenge in this construction project.